We started to lease the Gospel Hall in June 2022 from the Church Growth Trust and then began refurbishing the building with their blessing. Walls were moved to create an accessible toilet and enlarged kitchen with hatches into the main and side halls.

All the windows and front door were replaced and solar panels and a battery installed.

As many of the previous paving slabs were broken we laid a new pathway and tiles to the front door.

The land to the rear of the buiding was chest high with brambles which were removed, the ground levelled and much rubbish taken away along with a tree stump.

Refurbishment

Before

AFTER

We would like to thank Westmill Solar for their grant of £5000 to help fund our solar panels.